Concrete construction; Grand Coulee Dam (Wash.);Hydroelectric power plants -- Washington (State);Dams -- United States -- Design and construction.
Portions of the foundation level of Grand Coulee Dam have been poured, others remain to be poured. In the foreground, cooling coils are visible. These were required to maintain the desired temperature for optimum curing of the concrete.
Grand Coulee Dam (Wash.);Hydroelectric power plants -- Washington (State);Dams -- United States -- Design and construction.
Removal of one of the towers used to support the conveyor belt which delivered aggregate to the west side mix plant. The foundation level of Grand Coulee Dam is complete, and the river flows through diversion slots in the dam.