State Normal School (Cheney, Wash.); Eastern Washington University -- Buildings -- History
Side view of the remains of the Administration Building of the Cheney State Normal School (now Eastern Washington University) destroyed by fire on April 24, 1912.
Eastern Washington State College; Eastern Washington University -- Buildings -- History; Streeter Hall (Eastern Washington University)
Photograph of Streeter Hall on the campus of Eastern Washington State College (currently Eastern Washington University) taken from east side, showing cars parked along N. Tenth Street.
Eastern Washington College of Education; Eastern Washington University -- Buildings -- History; Hargreaves Library (Eastern Washington University); Libraries
Photograph of the side view of Hargreaves Library, Eastern Washington College of Education (currently Eastern Washington University). Photograph shows students walking on the path near the library.
Eastern Washington State College; Eastern Washington University -- Buildings -- History; Dressler Hall (Eastern Washington University); Pearce Hall (Eastern Washington University)
View of student housing under construction on the campus of Eastern Washington State College (currently Eastern Washington University). Pearce Hall, recently completed, in right side of photo, and Dressler Hall, under construction, in center of...
Photograph of the F.M. Martin Grain & Milling Co., an early mill located on the north side of the Northern Pacific Railroad tracks in Cheney, Washington. Photograph shows Northern Pacific Railroad cars, horses and wagon, bags of grain, and...
Photograph of the interior of Martin Hubbard's general store located in Cheney, Washington. The building was constructed about 1900 and was located on First Street. The photograph shows four people in period clothing, goods lining the shelves on...
Grand Coulee Dam (Wash.);Hydroelectric power plants -- Washington (State);Dams -- United States -- Design and construction.
Removal of one of the towers used to support the conveyor belt which delivered aggregate to the west side mix plant. The foundation level of Grand Coulee Dam is complete, and the river flows through diversion slots in the dam.
Grand Coulee Dam (Wash.);Hydroelectric power plants -- Washington (State);Dams -- United States -- Design and construction.
Shows construction method for the lower portion of the dam. Alternating blocks were constructed. The Columbia River was forced through slots by placement of temporary gates on the upstream side of the dam.
Grand Coulee Dam (Wash.);Hydroelectric power plants -- Washington (State)
View looking west across the reservoir side of the dam. The spillway drum gates are not installed, and the roadway across the top of the dam has not been built yet.
TRASH RACKS (HYDRAULIC STRUCTURES); Grand Coulee Dam (Wash.);Hydroelectric power plants -- Washington (State);Dams -- United States -- Design and construction.
Trash Racks on the upstream side of Grand Coulee Dam. The trash racks were to keep floating debris from entering the penstocks and damaging the turbines.